
Need a site plan for a permit in Prince Edward Island? Whether you are planning a new home, addition, garage, deck, shed, pool, fence, carport, driveway change, or another residential project, your municipality or the provincial Lands Division may ask for a clear drawing that shows how the proposed work fits on your property.
A Prince Edward Island site plan helps show property lines, setbacks, lot layout, existing buildings, proposed construction, driveway access, parking, wells, septic systems, services, drainage, slopes, landscaping, and nearby site features.
This guide explains what a PEI permit site plan usually includes, why property lines and setbacks matter, how lot layout affects review, and what homeowners should prepare before submitting drawings for a development permit, building permit, or municipal review.
What Is a Prince Edward Island Site Plan?
A Prince Edward Island site plan is a scaled drawing of a property from above. It shows the existing site layout and the proposed project location so a permit reviewer can understand the work in context.
A residential site plan may show:
- property lines and lot dimensions;
- existing house footprint;
- existing garage, shed, deck, patio, driveway, fence, or accessory building;
- proposed project footprint;
- front, side, and rear yard setbacks;
- driveway access, road access, parking, and vehicle circulation;
- walkways, stairs, gates, decks, and outdoor access routes;
- well and septic locations where applicable;
- water and sewer service information where known;
- natural slopes, drainage direction, ditches, swales, and culverts where relevant;
- nearby wetlands, rivers, sand dunes, steep banks, or protected areas where applicable;
- trees, landscaping, and hard surface areas;
- easements, rights-of-way, and encroachments if known;
- north arrow, drawing scale, civic address, PID, and legal description if available.
The goal is simple: the site plan should make the proposed project easy to review. A reviewer should be able to see what exists now, what is proposed, how close the work is to property lines, and whether access, servicing, setbacks, drainage, slopes, wells, septic systems, or protected features may be affected.
When Do You Need a Site Plan in PEI?
Permit requirements in Prince Edward Island depend on where the property is located, the type of project, the municipality, zoning or land-use rules, servicing, environmental features, and whether the project needs a development permit, building permit, or both.
The Province of Prince Edward Island explains that, in almost all instances, both a Development Permit and a Building Permit are required before construction can begin. A development permit deals with land use and how a structure is situated on a parcel of land, while a building permit deals with construction-code compliance.
Official source: Government of Prince Edward Island – Building and Development in PEI
A site plan is commonly needed when a project changes the property layout, adds a structure, changes access, affects setbacks, involves well or septic placement, or needs review for nearby roads, water bodies, wetlands, steep banks, dunes, or other protected areas.
Common PEI projects that may need a site plan include:
- new homes;
- home additions;
- attached or detached garages;
- carports;
- decks and patios;
- sheds and accessory buildings;
- pools and hot tubs;
- fences and gates;
- driveway changes or new road access;
- projects involving wells, septic systems, culverts, ditches, or drainage routes;
- projects near property lines, roads, watercourses, wetlands, dunes, steep banks, slopes, or services.
Development Permit vs Building Permit in PEI
In Prince Edward Island, a residential project may involve more than one type of permit.
Development Permit
A development permit deals with how land will be used and how the proposed structure is located on the land. It can include review of setbacks, water and sewer servicing, highway access, environmental features, and the overall placement of the project on the property.
Official source: Government of Prince Edward Island – Apply for a Development Permit
Building Permit
A building permit helps confirm that the structure is designed and built according to the applicable construction codes, such as the National Building Code and provincial building requirements.
Official source: Government of Prince Edward Island – Building and Development Permits
For many residential projects, the site plan supports the development side of the review because it shows where the project goes, how it is accessed, how it is serviced, and how it relates to the lot.
Where Do You Apply for Permits in PEI?
Where you apply depends on the location of the property.
The Province explains that Charlottetown, Stratford, and Summerside issue their own development and building permits. Municipalities with an official plan and land-use bylaws issue their own development permits, while the provincial Lands Division handles building permits for those jurisdictions. If the property is outside a municipality, or within a municipality without an official plan and land-use bylaws, the Lands Division handles both development and building permits.
Because of this, a site plan for Charlottetown may not be the same as a site plan for Summerside, Stratford, Montague, Kensington, Cornwall, Three Rivers, Souris, Alberton, or a rural area. Always confirm the local process before submitting.
Why Property Lines Matter
Property lines are the foundation of a permit site plan. Setbacks, building placement, fence location, driveway access, well and septic placement, lot layout, and easements all depend on knowing where the legal boundaries are.
A PEI site plan may show:
- front property line;
- rear property line;
- side property lines;
- road frontage;
- corner lot or flanking road boundary;
- irregular or angled boundary lines;
- easement or right-of-way lines;
- fence lines if different from the legal boundary.
Do not assume that an existing fence, hedge, tree line, driveway edge, ditch, or landscaping border is the legal property line. If your project is close to a boundary, survey information may be needed before construction begins.
The Association of Prince Edward Island Land Surveyors regulates professional land surveying in PEI and provides public information about land survey services.
Official source: Association of Prince Edward Island Land Surveyors
Site Plan vs Survey Plan in Prince Edward Island
A site plan and a survey plan are related, but they are not the same thing.
Survey Plan
A survey plan is prepared by a Prince Edward Island Land Surveyor. It can help identify property boundaries, lot dimensions, survey markers, subdivision information, and other measured land details.
Site Plan
A site plan uses available property information to show the proposed project layout. It explains where the work will go and how it relates to property lines, setbacks, existing buildings, access, services, wells, septic systems, slopes, and protected features.
A survey plan can be very helpful when:
- the project is close to a property line;
- the lot is irregular;
- the fence line may not match the legal boundary;
- there are easements or rights-of-way;
- well or septic placement is involved;
- the project is near a road, shoreline, wetland, river, dune, or steep bank;
- the municipality or province asks for survey information;
- an addition, garage, deck, or accessory building is being reviewed;
- neighbouring properties may be affected.
SitePlans.ca can prepare a clear site plan from available property information, sketches, municipal comments, project details, and survey documents. If a legal boundary must be established or confirmed, that work should be completed by a Prince Edward Island Land Surveyor.
Why Setbacks Matter
Setbacks show how far the proposed work is from property lines, roads, water bodies, protected areas, wells, septic systems, and other structures. They are one of the most important items on a PEI permit site plan.
The Province explains that setbacks are the minimum distances a structure or sewage disposal system must be set back from adjacent property boundaries, roadways, bodies of water, or other protected areas.
A site plan may need to show:
- front yard setback;
- rear yard setback;
- side yard setbacks;
- setback from a public road;
- setback from a private road or access route;
- distance from the proposed structure to the existing house;
- distance to garages, sheds, decks, fences, pools, or accessory buildings;
- distance to wells and septic systems;
- distance to wetlands, rivers, sand dunes, steep banks, bodies of water, or protected areas.
Official source: Government of Prince Edward Island – Building and Development in PEI
Because setback requirements can vary by location and feature type, the site plan should show actual measured distances from the proposed work to relevant boundaries and site features. Reviewers should not need to guess.
Why Lot Layout Matters
Lot layout is the full arrangement of the property. It shows how the proposed project works with the existing house, driveway, road access, yard areas, services, well, septic system, slopes, drainage, and neighbouring features.
A clear lot layout helps show:
- where the proposed structure will be built;
- how large the project is;
- how close the project is to property lines;
- how vehicles and people access the property;
- whether parking or driveway layout is affected;
- whether well or septic locations are affected;
- whether drainage patterns are changing;
- whether wetlands, rivers, dunes, steep banks, slopes, or protected areas are nearby;
- whether additional drawings or professional review may be needed.
A rough sketch may not show enough information. A clear, scaled site plan gives homeowners, contractors, designers, municipal staff, and provincial reviewers a shared layout to work from.
What PEI Says a Site Plan Should Show
The Prince Edward Island Development Permit Process Guide gives a helpful list of what a site plan should illustrate.
According to the guide, a site plan should show:
- the size of the lot, including dimensions of each side;
- property lines;
- roads near or on the property;
- how far the new building or structure is from the road and property lines;
- the space between the well and septic system;
- where the well and septic tank are located;
- how far the well and septic tank are from buildings;
- how close the property is to wetlands, rivers, sand dunes, or steep banks if any;
- the natural slopes of the land;
- all buildings or structures already on the property.
Official source: Government of Prince Edward Island – Development Permit Process Guide
This is exactly why a site plan should show the whole property context, not just a single box labelled “proposed building.”
What Should a Prince Edward Island Permit Site Plan Include?
The exact requirements depend on the municipality, provincial review process, project type, and site conditions. Still, most PEI residential site plans include a similar set of core details.
1. Civic Address, PID, and Legal Description
The site plan should identify the property clearly. Helpful information includes:
- civic address;
- Property Identification Number, or PID, if available;
- municipality or rural area;
- legal description if available;
- drawing date;
- drawing scale;
- north arrow.
The PEI Development Permit Process Guide says the application should include the Property Identification Number, mailing address, subdivision lot number if applicable, and a short description of what you plan to build or change.
2. Property Lines and Lot Dimensions
The full property boundary should be shown clearly. Lot width, lot depth, frontage, and irregular boundary dimensions should be included where available.
This is especially important for:
- corner lots;
- narrow lots;
- irregular rural parcels;
- shoreline or coastal properties;
- lots near wetlands, rivers, steep banks, or sand dunes;
- lots with easements or rights-of-way;
- projects near fences or neighbouring properties.
3. Existing House and Structures
The existing house should be shown and labelled. Other existing structures should also be shown when they affect the project.
These may include:
- garage;
- shed;
- carport;
- deck;
- porch;
- patio;
- pool;
- fence or gate;
- driveway or parking pad;
- walkways, stairs, and ramps;
- well or septic system if known.
4. Proposed Project Footprint
The proposed work should be clearly labelled. Use simple labels such as:
- Proposed Addition;
- Proposed Garage;
- Proposed Deck;
- Proposed Shed;
- Proposed Carport;
- Proposed Pool;
- Proposed Fence;
- Proposed Dwelling;
- Proposed Accessory Building.
The drawing should show the project’s length, width, footprint, and relationship to the rest of the property.
5. Setback Dimensions
Setbacks should be labelled clearly. A reviewer should be able to see the distance from the proposed project to each relevant boundary or site feature.
Show setbacks from the proposed work to:
- front property line;
- rear property line;
- side property lines;
- public road or private road boundary;
- existing house;
- detached garage or accessory structures;
- well, septic system, sewage disposal system, or service area if applicable;
- wetland, river, sand dune, steep bank, body of water, or protected area if applicable.
6. Access and Parking
The site plan should show how vehicles and people access the property and the proposed structure.
Access details may include:
- driveway location;
- driveway width if known;
- public road access;
- private road or shared access if applicable;
- garage or carport door location;
- parking space location;
- walkways and pedestrian paths;
- gate locations;
- culvert, ditch, or access crossing where relevant.
Access is especially important for garages, carports, driveway changes, rural lots, accessory buildings, and projects near public roads or shared driveways.
7. Well, Septic, Water, and Sewer Services
Service information is especially important in PEI because many properties involve private wells, septic systems, or sewage disposal system setbacks.
The site plan may show known:
- well location;
- septic tank location;
- sewage disposal system or septic field if known;
- distance between well and septic system;
- distance from well and septic tank to buildings;
- municipal water service;
- municipal sewer service;
- proposed service routes if known.
If well or septic information is unclear, a licensed septic contractor, surveyor, designer, or permit coordinator may need to help confirm the correct information.
8. Natural Slopes and Drainage
Drainage and slopes show how water moves across the property. This is important because new roofs, driveways, patios, pools, and grading changes can redirect water.
A site plan may show:
- natural slope direction;
- surface drainage arrows;
- roof drainage direction;
- downspout locations;
- swales;
- ditches or culverts where relevant;
- driveway slope;
- areas where water should not discharge.
Water should not be directed toward the house foundation, neighbouring properties, roads, driveways, septic areas, wells, dunes, steep banks, or low areas where ponding may occur.
9. Wetlands, Rivers, Dunes, Steep Banks, and Protected Areas
Some PEI properties are close to sensitive or protected natural features. If those features are present or nearby, they should be shown on the site plan where applicable.
Important features may include:
- wetlands;
- rivers;
- streams;
- ponds;
- bodies of water;
- sand dunes;
- steep banks;
- coastal erosion or flood hazard areas;
- other protected areas.
The Province notes that property owners can request a coastal hazard assessment to learn about potential erosion and flood hazards for a coastal property.
Official source: Government of Prince Edward Island – Building and Development in PEI
10. Easements and Rights-of-Way
Easements and rights-of-way can affect where buildings, fences, decks, pools, sheds, driveways, and service trenches can be placed.
Known site constraints should be shown, including:
- utility easements;
- access rights-of-way;
- shared driveways;
- drainage easements;
- registered encroachments;
- service corridors;
- private road rights;
- shoreline or watercourse-related restrictions if known.
11. Trees, Landscaping, and Hard Surfaces
Trees, landscaping, and hard surfaces can affect site layout, drainage, access, and project placement.
A site plan may show:
- existing trees on the property;
- trees near the proposed work;
- shrubs and landscaped areas;
- fences and garden areas;
- driveways and parking pads;
- patios and walkways;
- decks and stairs;
- hard surface areas that affect drainage.
PEI Projects That Commonly Need Site Plans
New Home Site Plans
A new home site plan should show the proposed dwelling, property lines, setbacks, road access, well or sewer servicing, septic system location where applicable, drainage, slopes, and existing or proposed accessory structures.
Garage Site Plans
A garage site plan should show the proposed garage footprint, existing house, driveway access, parking layout, setbacks, drainage, services, easements, and property lines.
Addition Site Plans
An addition site plan should show the existing house, proposed addition, setbacks, services, drainage, slopes, easements, and nearby structures.
Deck Site Plans
A deck site plan should show deck size, stairs, height if known, setbacks, property lines, doors, existing house, and nearby patios, fences, slopes, or accessory buildings.
Shed and Accessory Building Site Plans
A shed or accessory building site plan should show the proposed structure, side and rear setbacks, property lines, existing house, trees, drainage, easements, and backyard access.
Carport Site Plans
A carport site plan should show roof area, support posts, parking layout, driveway access, setbacks, roof drainage, existing house, and property lines.
Pool Site Plans
A pool site plan should show the pool location, safety barrier, gates, equipment pad, setbacks, drainage, pool deck, services, and nearby structures.
Fence Site Plans
A fence site plan should show property lines, fence alignment, fence height, gates, driveway visibility, roads, access points, and neighbouring features where relevant.
Why PEI Permit Requirements Vary
Prince Edward Island has provincial planning and building permit processes, but municipalities can also issue permits and apply local land-use bylaws. This means requirements can vary by location and project type.
A site plan for Charlottetown may not be the same as a site plan for Stratford, Summerside, Cornwall, Montague, Kensington, Three Rivers, Souris, Alberton, Tignish, or a rural parcel outside a municipality.
For example:
- Charlottetown, Stratford, and Summerside issue their own development and building permits;
- some municipalities issue their own development permits but provincial offices issue the building permit;
- rural properties may involve wells, septic systems, ditches, culverts, private roads, and larger setback questions;
- some properties may be near wetlands, rivers, sand dunes, steep banks, or coastal hazard areas;
- some projects may require a sewage disposal system review, site suitability assessment, survey, or additional professional information.
The best site plan is property-specific and local-review-focused.
Common Site Plan Mistakes That Delay Permits
Many permit delays happen because the site plan is missing basic information. Avoid these common mistakes:
- not showing the full property boundary;
- assuming the fence is the legal property line;
- not showing lot dimensions;
- not including the civic address or PID when requested;
- not labelling the existing house;
- not identifying the proposed project clearly;
- forgetting project dimensions;
- not showing setback distances;
- not showing driveway or road access;
- missing parking information;
- not showing well or septic information when relevant;
- not showing wetlands, rivers, sand dunes, steep banks, or protected areas when relevant;
- not showing natural slopes or drainage direction;
- not showing existing accessory buildings;
- using a rough sketch that is not scaled or labelled.
What to Gather Before Ordering a PEI Site Plan
Before preparing a site plan, gather as much property and project information as possible.
Helpful items include:
- property civic address;
- Property Identification Number, or PID;
- legal description if available;
- survey plan if available;
- municipal or provincial permit comments if already received;
- photos of the property;
- sketch of the proposed project;
- project dimensions;
- distance from proposed work to property lines if known;
- location of existing house, garage, shed, deck, patio, driveway, pool, fences, and accessory buildings;
- driveway, road, private road, culvert, or access information;
- well, septic, water, sewer, or utility information if relevant;
- known easements or rights-of-way;
- slope, ditch, wetland, river, dune, steep bank, drainage, or coastal information if relevant;
- contractor, designer, septic contractor, surveyor, or engineer documents if available.
The more accurate the starting information, the more useful the finished site plan can be.
How SitePlans.ca Helps Prince Edward Island Homeowners
SitePlans.ca prepares clear, easy-to-read site plans for residential permit projects across Prince Edward Island and Canada. Our goal is to help homeowners, contractors, designers, and permit applicants organize the site information into a clean drawing that supports municipal or provincial review.
Depending on your project, your PEI site plan can show:
- existing house and structures;
- proposed project footprint;
- property lines and lot dimensions;
- front, side, and rear setbacks;
- driveway, parking, and access layout;
- well, septic, water, sewer, and other services where known;
- natural slopes and drainage direction;
- ditches, culverts, downspouts, and hard surfaces;
- nearby wetlands, rivers, dunes, steep banks, or protected areas where relevant;
- trees, landscaping, easements, rights-of-way, and nearby constraints.
A site plan is not a substitute for a legal survey, engineering, architectural design, zoning approval, development permit, building permit, septic approval, coastal hazard review, or municipal/provincial review when those are required. But it is often the drawing that helps everyone understand the property layout before the more technical parts of the permit package are reviewed.
Need a Prince Edward Island Site Plan for a Permit?
If your municipality or the provincial Lands Division has asked for a site plan, or if you are preparing a permit package for a residential project, SitePlans.ca can help create a clear, permit-ready drawing based on your property information and project details.
We can help with site plans for Prince Edward Island projects such as new homes, garages, additions, decks, sheds, pools, fences, carports, driveway changes, accessory buildings, and other residential improvements.
Order your Prince Edward Island site plan from SitePlans.ca
Final Thoughts
A Prince Edward Island site plan is one of the most useful drawings for many residential permit projects. It shows how the proposed work fits on the property and helps reviewers understand property lines, setbacks, lot layout, access, services, wells, septic systems, slopes, drainage, protected areas, and existing structures.
Property lines matter because they control where setbacks are measured. Setbacks matter because they help confirm whether the project is far enough from boundaries, roads, water bodies, and protected areas. Lot layout matters because reviewers need to see the full property context, especially where wells, septic systems, slopes, road access, wetlands, dunes, or coastal features are involved.
Before submitting a permit application in PEI, confirm the local process, verify property information, show the proposed work clearly, and prepare a site plan that makes the project easy to review.
Official Sources
- Government of Prince Edward Island – Building and Development in PEI
- Government of Prince Edward Island – Building and Development Permits
- Government of Prince Edward Island – Apply for a Development Permit
- Government of Prince Edward Island – Development Permit Process Guide
- Prince Edward Island – Land Survey Act
- Association of Prince Edward Island Land Surveyors
- Association of Prince Edward Island Land Surveyors – Need a Survey?
- Government of Prince Edward Island – PEI Land Online Geographic Information
SITEPLANS.CA